Multi-Unit Housing
A durable, repeatable structural system for housing programs that need more schedule certainty without sacrificing architectural choice.
Housing delivery is constrained by sequential schedules, labour pressure, weather exposure and the cost of uncertainty.
Lodestar moves repeatable structural work into controlled manufacturing while site preparation advances in parallel. Connected and stacked concrete units create a platform for multiple levels, varied unit plans and different exterior expressions.
Designed around multi-unit housing priorities.
A focused set of advantages for this project type.
01 / Scale
Repeat structural geometry across unit types and phases while maintaining room for project-specific planning.
02 / Schedule
Reduce framing time and compress the period between prepared site and enclosed structure.
03 / Durability
Use reinforced precast concrete as the long-life structural starting point.
04 / Flexibility
Connect, stack, use infill and integrate conventional components where the design needs them.
05 / Quality
Manufacture under controlled processes with repeatable inspections.
06 / Predictability
Reduce exposure to site labour and weather variables during structural production.
St. Vincent de Paul
More than 15,000 square feet of foundation and structural units were installed in 28 hours with one crane and a five-person crew.
Rethink multi-unit housing delivery.
Bring Lodestar into the earliest project conversations to test fit, layout and sequencing.